Lease Your Land

Explore the benefits of leasing your land for renewable energy.

How it works

Let us take care of the development. Our expert team will take care of the project from site assessment to installation at no cost to the property owner.

01

Site Evaluation

Surya Powered completes a preliminary site assessment to measure available space in order to provide you a lease rate.
02

Design & Planning

We are forming a long-term partnership with you so we ensure all of your needs are addressed. This includes necessary access and clearances.
03

Permitting & Building Codes

We handle all of the paperwork. We work with the utility, village, and the county and meet all building code regulations and environmental requirements.
04

Installation

Whether it's our industry-leading ground-mounted solar racking or a fenced battery storage pad, our systems are built to spec and will not cause damage to your land.

Why partner with Surya Powered?

We prioritize forging long-term partnerships with landowners based on trust, transparency, and mutual respect. With a proven track record of collaboration, we work closely with landowners to maximize the value of their properties while ensuring minimal disruption to the local community. Our commitment to fostering positive relationships and delivering tangible benefits underscores our dedication to sustainable development and shared prosperity with our partners and communities alike.

Frequently asked questions

We’re here to answer your questions, every step of the way.

Who is responsible for property damages?

Before we sign any lease agreements we do an in-depth land analysis to ensure your lands integrity. Throughout the contract term we keep liability insurance. In addition, we post a decommissioning bond with the local AHJ to ensure that once the project lifecycle is complete there are funds available for decommissioning the system and restoring the site to prior use.

What is the frequency of the lease payments and typical lease terms?

Unless otherwise stated lease payments are made annually. Our contract terms are 20 years with four 5-year extension options.

How is my rent determined?

Rent is based on parcel size, project size, and the location's value to the grid. You will see the proposed rate in the offer before signing.

How will a lease affect my property taxes?

Surya Powered is responsible for any increases in property tax that result from our improvements to the land. Your baseline tax on the underlying parcel is not affected by the project.

What if my land has a mortgage or is held in a trust?

Both are workable. If there is a mortgage on the property we coordinate with your lender on a non-disturbance agreement so the lease is protected, and we handle the paperwork on our side. For land in a trust or LLC, we work with whoever is authorized to sign on behalf of the entity.

Can I still farm or graze the rest of my land?

Only the leased footprint is taken out of production. The rest of your acreage is yours to continue farming, grazing, or using exactly as you do today. Where it makes sense, livestock grazing inside the project fence may also be possible.

What happens during the option period before construction?

After signing, we enter an option period to complete environmental studies, permitting, interconnection, and engineering. You receive option payments during this phase even before construction starts. Once the project is operational, full lease payments take over.

How long does construction take and how disruptive is it?

A typical project takes roughly 4 to 8 months from groundbreaking to commissioning, depending on size and weather. Activity stays contained to the leased area and the access road, and crews stage their own equipment and facilities. Once the build is complete we restore the surrounding area and full lease payments begin.

Is battery storage safe? What about fire risk?

Modern battery storage systems are built and operated to strict national and local safety standards, with continuous monitoring, fire detection, and required setbacks from neighboring uses. Before construction we coordinate with the local fire department and AHJ on emergency response, and every project must meet all applicable fire and energy storage codes. Safety is a non-negotiable part of every site design.

Will the battery system make noise?

Battery storage produces a low hum from cooling equipment and inverters during operation, comparable to an HVAC unit. Sites are designed with setbacks and screening so noise stays well within local limits at the property line. We share the projected sound study with you as part of the site evaluation.

Why does battery storage need to be near a substation?

A battery project charges from and discharges to the electric grid, so it has to interconnect with existing grid infrastructure. Parcels close to a substation, transmission line, or distribution feeder are what make a battery site viable, even if the parcel is small. If your land is near grid infrastructure, even a few acres can support a meaningful long-term lease.

Who handles maintenance?

We are responsible for all maintenance over the life of the lease. Routine maintenance is infrequent and includes things like vegetation management, panel washing, and inverter or battery inspections. You are not responsible for any operation or maintenance.

What is your decommissioning process?

At the end of the project life, we remove the system, remove all materials, recycle solar panels or responsibly recycle and dispose of battery components, and restore the project site back to its original condition. Prior to construction we post a decommissioning bond with the local AHJ to ensure that once the project lifecycle is complete there are funds available for decommissioning the system and restoring the site to prior use.

Did we miss your question? Drop us a line and we will
get back within 24 hours.

Contact Us

Drop us a line and a member of our team will get back to you as soon as possible!

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.